Customization: | Available |
---|---|
After-sales Service: | Consulting/Customization |
Warranty: | Consulting/Customization |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Galvanized Steel Pipe
Galvanized steel pipe refers to the surface coated with a layer of zinc steel pipe, with corrosion resistance, high temperature resistance, long use time, economic applicability, beautiful and other characteristics, which is widely used in construction, manufacturing, automobile, machinery, furniture and other fields.
Production Name
|
Galvanized Pipe
|
Standard
|
ASME, ASTM, EN, GB, DIN, JIS, etc
|
Type
|
Round, Square, Rectangular, Oval, Angle, Hexagonal
|
Production Size
|
Outer Diameter/Width: 6-500mm or as required
Thickness: 0.1-100mm or as requiredLength: 1-12m or as required |
Material Grade
|
10#, 20#, 45#, 16Mn, A53(A,B), Q235, Q345, Q195, Q215, St37, St42, St37-2, St35.4, St52.4, ST35 etc.
|
Zinc Coating
|
20-275g/m2
|
Package
|
Exporting Packing
|
Delivery Time
|
5~7 days after deposit
|
Productivity
|
100000 Ton Per Month
|
Application
|
Construction, machinery, coal mine, chemical industry, electric power, railway vehicle, automobile industry, etc.
|
Sample
|
Sample service
|
Q1. What are your company's main products?
A1: Our main products are stainless steel/carbon/galvanized plate/sheet, coil, round/square pipe, bar, channel, etc.
Q2. How do you control quality?
A2: Mill Test Certification is supplied with shipment, Third Party Inspection is available.
Q3. What are the advantages of your company?
A3: We have many professionals, technical personnel, more competitive prices and best after-dales service than other steel companies
Q4. How many coutries you already exported?
A4: Exported to more than 50 countries mainly from America, Russia, UK, Kuwait, Egypt, Turkey, Jordan,India, etc.
Q5. Can you provide sample?
A5: Small samples in store and can provide the samples for free.Customized samples will take about 5-7days.